Beaverhead River moose |
There is a great op-ed in the Missoulian today from Wade Fellin, Program Director for the Upper Missouri Waterkeeper, Inc. It is a call to action for the Beaverhead River's recent algae issues and is critical of the proposed hydroelectric use of the Clark Canyon Dam.
No comments:
Post a Comment